Unit 701 Balcony and Brick Planter Update
Activities are as follows:
4/8:
Remove EIFS and substrate board from exterior wall at Unit 701.
Re-install substrate board and water resistive barrier
4/9:
Remove EIFS and substrate board from exterior wall at Unit 701.
Re-install substrate board and water resistive barrier
4/10:
Remove EIFS and substrate board from exterior wall at Unit 701.
Re-install substrate board and water resistive barrier
The most noise that will be present will be using a grinder to cut into the existing EIFS and debris disposal through the trash shoot.
Please let me know if you have any questions or concerns.